On-Site Integration

Deploy physical AI robotics

Schedule a technical consultation with our senior systems integrators to map physical bottlenecks and legacy assets on your warehouse floor.

Technical FAQ

Integration parameters

How do you handle legacy hardware?

How do you guarantee operational uptime?

We design custom software layers that translate legacy PLC protocols into modern autonomous fleet commands. No complete rebuild required.

Our systems run on a redundant, self-correcting local edge network. If primary telemetry drops, the robotic fleet switches to deterministic safety protocols.

What is the typical deployment timeline?

Are your AI models deterministic?

A physical floor assessment takes 48 hours. Initial integration blueprints are delivered in 7 days, with physical deployment starting within 4 weeks.

Yes. We do not deploy speculative models. Every robotic path, collision-avoidance routine, and sorting decision is fully deterministic and auditable.

Symmetrical wide shot of an automated industrial warehouse floor, cool low-key studio lighting with sharp electric blue highlights, robotic arms aligned along a clean assembly line, high detail
Symmetrical wide shot of an automated industrial warehouse floor, cool low-key studio lighting with sharp electric blue highlights, robotic arms aligned along a clean assembly line, high detail
Global Operations

Systems engineering hubs

Our integration teams operate out of two key industrial corridors, providing 24/7 on-site support and rapid hardware dispatch.

Detroit Hub (Midwest Integration)

440 Burroughs St, Detroit, MI 48202

Silicon Valley Hub (Robotics R&D)

1601 Page Mill Rd, Palo Alto, CA 94304